Your Workers Can Bleed Out in 3 Minutes.
Your EMS Response Time is 7-10 Minutes.
What's Your Plan?
Every Site Visit. Every Inspection. Every Incident.
Are You Truly Prepared?
The Stakes:
OSHA Requirements You Can't Ignore:
- Trained first-aid personnel on-site when medical facilities aren't within 3-4 minutes
- Adequate first-aid supplies readily available
- Weatherproof containers with individually sealed items
- Weekly documented inspections of all kits
- Emergency eyewash/shower stations where corrosives present
The Real Costs of Non-Compliance:
- OSHA Citations: Up to $16,550 per violation
- Repeat Violations: Up to $165,514
- Cost Per Medically Consulted Injury: $43,000
- Workplace Fatality: Average cost $1.46M
- Workers' Compensation: Poor safety record increases premiums
The Harsh Reality:
What Actually Happens on Your Sites:
- Severe laceration from circular saw
- Crush injury from heavy equipment
- Amputation from machinery entanglement
- Fall from scaffold or ladder
- Electrical burn from arc flash
- Chemical exposure requiring decontamination
Your Complete Jobsite Medical Defense System
Multiple Access Points. Zero Excuses. Total Coverage.
The Foundation of Site Safety
- Wall-mounted stations at offices, trailers, break areas
- High-visibility cabinets co-located with AEDs
- 8-pack configuration for multi-casualty readiness
- 3-minute access from any work area
Station Options:
- Clear Polycarbonate Cabinet: Maximum visibility, tamper-evident, alarm-ready
- Metal Semi-Recessed: Low-profile, powder-coated, one-pull opening
- Weather-Resistant: ANSI/ISEA Z308.1 Type III/IV rated for harsh environments
Featured Products:
Rapid Response Where Work Happens
- Portable trauma backpacks for crew leaders
- Pelican cases for severe conditions
- Follow the work to remote areas
- Radio-equipped responder capability
Deployment Strategy:
- 1 kit per active crew (10-15 workers)
- Positioned with site supervisors
- Staged at high-risk operations
- Quick-deploy for multiple casualties
Featured Products:
Every Vehicle. Every Piece of Equipment.
- Truck cab mounting for all company vehicles
- Heavy equipment integration
- Weather-sealed containers
- Daily inspection integration
Coverage Requirements:
- All licensed vehicles
- Cranes and lifts
- Excavators and dozers
- Forklifts in warehouses
Featured Products:
When Seconds Count Most
- Belt/vest mounted for immediate access
- High-risk roles: Equipment operators, welders, riggers
- Self-aid/buddy-aid capability
- Compact, rugged design
Who Needs IFAKs:
- Heavy machinery operators
- Demolition crews
- Electrical workers
- Heights/confined space teams
Featured Products:
Implementation Roadmap
Navigate OSHA Requirements with Confidence
From Minimum Compliance to Best-in-Class Protection
| OSHA Minimum | Industry Standard | MED-TAC Solutions |
|---|---|---|
| "Adequate" supplies | ANSI Z308.1 Class A | Exceeds ANSI Z308.1 Class B |
| Basic first aid items | Standard trauma supplies | Hemorrhage control focus |
| Person trained in first aid | CPR/AED certified | Stop the Bleed® certified |
| Supplies "readily available" | Single first aid station | 4-Layer System™ |
| Weather-proof container | Basic sealed kits | ANSI Type IV ruggedized |
29 CFR 1910.151 (General Industry)
- Medical personnel requirements based on proximity
- Adequate first-aid supplies readily available
- Emergency eyewash/shower for corrosive exposure
29 CFR 1926.50 (Construction)
- First-aid supplies in weatherproof containers
- Individual sealed packets
- Weekly inspection documentation
- Certified first-aider when hospital not "reasonably accessible"
ANSI/ISEA Z308.1-2021 Updates
- Class B includes arterial tourniquet requirement
- Foil blanket for shock prevention
- Increased gauze quantities
Build Your Compliance System:
Inspection Readiness Scorecard:
Equipped for Your Site's Specific Hazards
Evidence-Based Solutions for Construction's Most Severe Injuries
SEVERE HEMORRHAGE/AMPUTATION
- CAT Gen 7 Tourniquets - CoTCCC recommended
- Hemostatic agents - Such as Celox Gauze
- Emergency Trauma Dressing - Pressure application
PENETRATING CHEST TRAUMA
- HyFin Vent Chest Seals - Vented design
- Twin pack for entry/exit wounds
- Occlusive dressing backup
CRUSH INJURIES
- SAM Splints - Moldable immobilization
- Ace wraps - Compression control
- Hypothermia kit - Prevent shock
FALLS FROM HEIGHT
- Cervical collars - Spinal protection
- Backboards/scoops - Safe movement
- Pelvic binders - Hemorrhage control
ELECTRICAL BURNS
- Burn dressings - Non-adherent
- AED - Defibrillation ready
- CPR masks - Protected ventilation
HAZMAT/CHEMICAL EXPOSURE
- Eyewash stations - 15-minute flush capability per ANSI Z358.1
- Decontamination supplies
- Burn sheets - Chemical resistant
Scalable Solutions for Every Site Size
From 10-Person Crews to 500+ Worker Projects
Your 4-Layer Configuration:
- Layer 1: 1 wall station (8-pack) at main entrance/trailer
- Layer 2: 1 mobile kit with supervisor
- Layer 3: Kit in each vehicle (2-3 typically)
- Layer 4: IFAKs for equipment operators
Recommended Products:
- Public Access Bleeding Control Station - Basic 8-Pack
- NAR Trauma Kit - Class A
- Individual Bleeding Control Kits (5-pack)
Your 4-Layer Configuration:
- Layer 1: 2-3 wall stations (strategic placement)
- Layer 2: 2-3 mobile kits (crew leaders)
- Layer 3: All vehicle equipped (5-8 vehicles)
- Layer 4: IFAKs for high-risk trades
Recommended Products:
- Public Access Stations - Intermediate 8-Pack
- NAR Trauma Kits - Class B
- TRAMEDIC Cabinet Kit
- Curaplex Multi-Pack Kits
Your 4-Layer Configuration:
- Layer 1: 4-8 wall stations (per floor/zone)
- Layer 2: 4-6 mobile kits (area supervisors)
- Layer 3: Full fleet equipped (15+ vehicles)
- Layer 4: IFAKs for 30%+ of workforce
Recommended Products:
- Public Access Stations - Advanced with Celox
- Mobilize Comprehensive Trauma Kit
- MOJO Public Access Trauma Stations
- Bulk IFAK programs
MEGA PROJECTS (500+ Workers)
Typical Projects: Stadiums, airports, industrial complexes
Custom Program Design:
- Dedicated medical trailer/room
- EMT/Paramedic staffing considerations
- Mass casualty incident planning
- Integrated command structure
Calculate Your Savings:
From Bystander to Lifesaver in 90 Minutes
Stop the Bleed® Certification for Your Entire Workforce
The Training Program
STOP THE BLEED® TRAINING
Core Skills Taught:
- Recognize life-threatening bleeding
- Direct pressure application
- Wound packing techniques
- Tourniquet application (self & buddy)
- Patient positioning & shock prevention
Who Should Be Trained:
- Mandatory: Site supervisors, foremen, safety officers
- Recommended: Equipment operators, riggers, welders
- Ideal: Entire workforce for comprehensive coverage
MED-TAC INSTRUCTOR CREDENTIALS
- Physician-owned, SOF veteran-led company
- Instructors trained MARSOC, USMS Special Operations
- TCCC/TECC doctrine experts
- Real-world experience - instructor saved by these techniques in Afghanistan
Documentation & Compliance
Training Documentation
Standard Training Deliverables:
- Certificate of completion (after hands‑on skills)
- Training completion verification
- Skills demonstration checklist
- Recommended refresher schedule
Frequency Recommendations
Integration with Safety Programs
Combines With:
- CPR/AED certification
- Bloodborne pathogen training
- Emergency action plan drills
- OSHA 30-hour courses
U.S. Army Crane Ammunition Activity implemented Stop the Bleed program to train workforce. Program covers remote worksites with explosive hazards and heavy machinery - similar risks to construction.
Professional-Grade Medical Equipment Trusted by Military & First Responders
OSHA-Compliant Solutions Starting at $63.00
Every Dollar Invested Returns $2 or More in Savings
Calculate Your Site's Potential Cost Reduction
Interactive ROI Calculator
Your Calculated Savings
| Savings Category | Year 1 | 3-Year Total |
|---|---|---|
| Reduced injury costs | $XX,XXX | $XXX,XXX |
| Workers' comp premium reduction | $XX,XXX | $XXX,XXX |
| Avoided OSHA citations | $XX,XXX | $XXX,XXX |
| Productivity gains | $XX,XXX | $XXX,XXX |
| Total Savings | $XXX,XXX | $XXX,XXX |
Cost Breakdown Visualization
Medical costs (40%) • Lost productivity (38%) • Administrative (12%) • Other (10%)
"26% Reduction in Workers' Comp Costs"
Cal/OSHA study: Workplaces saw average $355,000 savings after safety improvements
Your Compliance Questions Answered
3 Ways to Build Your Trauma Readiness Program
Get Compliant Now
Browse Full Collection
- OSHA-compliant solutions
- Starting at $63.00
- Ships within 48-72 hours for in-stock items
- Bulk/department quote pricing available
Custom Site Assessment
Free Consultation Includes:
- Site hazard analysis
- Product recommendations by zone
- Training needs assessment
- Compliance gap analysis
- Custom quote with ROI projection
Custom Site Packages
Build Your Site-Specific Bundle:
- Wall-mounted 8-pack bleeding control stations
- Mobile trauma kits for supervisors
- Vehicle-mounted kits for fleet
- Individual IFAKs for high-risk workers
- Inspection cards included
A worker died every 99 minutes from a work-related injury in 2023.
Don't wait for an incident to prepare.